Verify in field

Verify in field is a construction document notation indicating that the dimensions on a drawing (including architectural, structural, plumbing, mechanical, and electrical plans or miscellaneous vendor shop drawings) require additional verification on the actual site or field. This is commonly shown on drawings as "VIF". Generally, the dimensions to be verified will be highlighted by "bubbling" around them or through some other method to indicate that verification is required. * v * t * e

Comment
enVerify in field is a construction document notation indicating that the dimensions on a drawing (including architectural, structural, plumbing, mechanical, and electrical plans or miscellaneous vendor shop drawings) require additional verification on the actual site or field. This is commonly shown on drawings as "VIF". Generally, the dimensions to be verified will be highlighted by "bubbling" around them or through some other method to indicate that verification is required. * v * t * e
Has abstract
enVerify in field is a construction document notation indicating that the dimensions on a drawing (including architectural, structural, plumbing, mechanical, and electrical plans or miscellaneous vendor shop drawings) require additional verification on the actual site or field. This is commonly shown on drawings as "VIF". Generally, the dimensions to be verified will be highlighted by "bubbling" around them or through some other method to indicate that verification is required. * v * t * e
Hypernym
Notation
Is primary topic of
Verify in field
Label
enVerify in field
Link from a Wikipage to another Wikipage
Blueprint
Category:Construction documents
Dimensions
SameAs
4xf3v
m.09775n
Q7921332
Verify in field
Subject
Category:Construction documents
WasDerivedFrom
Verify in field?oldid=956602447&ns=0
WikiPageLength
636
Wikipage page ID
3351683
Wikipage revision ID
956602447
WikiPageUsesTemplate
Template:Architecture-stub
Template:Unreferenced